Changes to K Area Interim Surveillance Process Material Handling CX(s) Applied: B6.8 Date: 07/09/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 9, 2011Changes to K Area Interim Surveillance Process Material Handling
CX(s) Applied: B6.8
Date: 07/09/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The K Area Complex (KAC) Documented Safety Analysis (DSA) is being revised to allow increased process flexibility and waste minimization practices in the K Area Interim Surveillance (KIS) and Assembly process areas. The nuclear safety and criticality analysis is being revised to support increasing the amount of material which may be in the KIS and Assembly process areas at one time.
CX(s) Applied: B6.8
Date: 07/09/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The K Area Complex (KAC) Documented Safety Analysis (DSA) is being revised to allow increased process flexibility and waste minimization practices in the K Area Interim Surveillance (KIS) and Assembly process areas. The nuclear safety and criticality analysis is being revised to support increasing the amount of material which may be in the KIS and Assembly process areas at one time.