The purpose of this project is to dismantle and removal various sections of fencing starting near the E-Road entrance to F-Area, continuing along the Inner Loop Road east of 284-8F, past the east side of 235-F between the Inner and Outer Loop roads, and concluding south of 706-1F. Metal fencing will be loaded in Roll Off Pans and disposed of in the C&D Landfill.
CX(s) Applied: B1.23
Date: 07/16/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The purpose of this project is to dismantle and removal various sections of fencing starting near the E-Road entrance to F-Area, continuing along the Inner Loop Road east of 284-8F, past the east side of 235-F between the Inner and Outer Loop roads, and concluding south of 706-1F. Metal fencing will be loaded in Roll Off Pans and disposed of in the C&D Landfill.