Concrete Culverts Storage in K-Area CX(s) Applied: B1.30 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 25, 2012Concrete Culverts Storage in K-Area
CX(s) Applied: B1.30
Date: 07/25/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Concrete culverts will be transferred from the Solid Waste Management Facility (SWMF) for storage at the K-Area Complex (KAC). The concrete culverts will be located in the Protected Area of KAC as an enhanced security provision for stored plutonium materials, consistent with the K-Area plutonium storage mission. Culverts storage duration in KAC is ultimately impacted by plutonium materials disposition decisions, but is anticipated to be less than 15 years.
CX(s) Applied: B1.30
Date: 07/25/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Concrete culverts will be transferred from the Solid Waste Management Facility (SWMF) for storage at the K-Area Complex (KAC). The concrete culverts will be located in the Protected Area of KAC as an enhanced security provision for stored plutonium materials, consistent with the K-Area plutonium storage mission. Culverts storage duration in KAC is ultimately impacted by plutonium materials disposition decisions, but is anticipated to be less than 15 years.