CX-008922: Categorical Exclusion Determination

Design and Construction of the Site Preparation and Foundation Work for the NCCC CX(s) Applied: B3.6 Date: 08/24/2012 Location(s): Alabama Offices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

August 24, 2012
Estimated Read Time   min
Design and Construction of the Site Preparation and Foundation Work for the NCCC
CX(s) Applied: B3.6
Date: 08/24/2012
Location(s): Alabama
Offices(s): National Energy Technology Laboratory

The project’s scope is to design and begin installation of underground supports (micropiles) for the foundation, slab, and containment structure for the third party technology testing.