Install Power Metering for Strategic Petroleum Reserve Site Buildings CX(s) Applied: B1.31 Date: 07/26/2012 Location(s): Louisiana, Texas, Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
July 26, 2012Install Power Metering for Strategic Petroleum Reserve Site Buildings
CX(s) Applied: B1.31
Date: 07/26/2012
Location(s): Louisiana, Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to install power metering at the four Strategic Petroleum Reserve (SPR) sites. The meters will monitor energy consumption at the SPR site control, administrative, and maintenance buildings.
CX(s) Applied: B1.31
Date: 07/26/2012
Location(s): Louisiana, Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to install power metering at the four Strategic Petroleum Reserve (SPR) sites. The meters will monitor energy consumption at the SPR site control, administrative, and maintenance buildings.