CX-008864: Categorical Exclusion Determination

Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

August 6, 2012
Estimated Read Time   min
"Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment
CX(s) Applied: B1.3
Date: 08/06/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Manufacturer/supplier shall provide 36” diameter pipe with fusion bonded epoxy coating, for crude oil service and store the pipe material until picked up by others. The manufacturer/supplier shall load materials onto Contractor supplied transportation.Installation of this Government Furnished Equipment (GFE) will be performed by others under BH-09-038."