Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
August 6, 2012"Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment
CX(s) Applied: B1.3
Date: 08/06/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Manufacturer/supplier shall provide 36” diameter pipe with fusion bonded epoxy coating, for crude oil service and store the pipe material until picked up by others. The manufacturer/supplier shall load materials onto Contractor supplied transportation.Installation of this Government Furnished Equipment (GFE) will be performed by others under BH-09-038."
CX(s) Applied: B1.3
Date: 08/06/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Manufacturer/supplier shall provide 36” diameter pipe with fusion bonded epoxy coating, for crude oil service and store the pipe material until picked up by others. The manufacturer/supplier shall load materials onto Contractor supplied transportation.Installation of this Government Furnished Equipment (GFE) will be performed by others under BH-09-038."