CX-008863: Categorical Exclusion Determination

Dredging of the West Hackberry Raw Water Intake Structure CX(s) Applied: B1.3 Date: 08/14/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

August 14, 2012
Estimated Read Time   min
Dredging of the West Hackberry Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 08/14/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all materials, tools, equipment, supplies, transportation, labor, supervision, and services required to perform the work associated with the dredging of the West Hackberry Raw Water Intake Structure approach channel of mud, silt, and debris, to include cleaning the pump intake sump.