Southwestern Power Administration proposes to move several transmission line pole structures which are currently located on elevated gravel mounds and relocate several other structures.
CX(s) Applied: B2.5
Date: 07/02/2012
Location(s): Arkansas
Offices(s): Southwestern Power Administration
Southwestern Power Administration proposes to move several transmission line pole structures which are currently located on elevated gravel mounds and relocate several other structures.