CX-008771: Categorical Exclusion Determination

Buried Flow Line from T-2-34 to T-1-33 CX(s) Applied: B2.5, B5.2, B5.4 Date: 06/27/2012 Location(s): Wyoming Offices(s): RMOTC

Office of NEPA Policy and Compliance

June 27, 2012
Estimated Read Time   min

Buried Flow Line from T-2-34 to T-1-33
CX(s) Applied: B2.5, B5.2, B5.4
Date: 06/27/2012
Location(s): Wyoming
Offices(s): RMOTC

The purpose of this project is to replace the shipping line between T-2-34 and T-1-33. The new shipping line will help to enhance the oil production of NPR-3.