45-Mile Hydroelectric Power Project Demonstration of New Methodologies to Reduce the LCOE for Small Hydropower Development (Formerly 51 Mile Project) CX(s) Applied: B5.15 Date: 05/22/2012 Location(s): Oregon Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
May 22, 201245-Mile Hydroelectric Power Project Demonstration of New Methodologies to Reduce the LCOE for Small Hydropower Development (Formerly 51 Mile Project)
CX(s) Applied: B5.15
Date: 05/22/2012
Location(s): Oregon
Offices(s): Golden Field Office
Earth by Design, Incorporated is proposing to use Department of Energy funding to perform planning, design, engineering, construction, operation, performance monitoring, and cost/benefit assessment for a hydroelectric facility on the North Unit Irrigation District's Main Canal in Culver, Jefferson County, Oregon.
CX(s) Applied: B5.15
Date: 05/22/2012
Location(s): Oregon
Offices(s): Golden Field Office
Earth by Design, Incorporated is proposing to use Department of Energy funding to perform planning, design, engineering, construction, operation, performance monitoring, and cost/benefit assessment for a hydroelectric facility on the North Unit Irrigation District's Main Canal in Culver, Jefferson County, Oregon.