Qualification of Flexible Reinforced Pipe for 10,000 Foot Water (Phase One and Two) CX(s) Applied: A9, B3.6 Date: 07/12/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
July 12, 2012Qualification of Flexible Reinforced Pipe for 10,000 Foot Water (Phase One and Two)
CX(s) Applied: A9, B3.6
Date: 07/12/2012
Location(s): Multiple
Offices(s): National Energy Technology Laboratory
Develop, qualify, and test flexible fiber reinforced pipe (FFRP) for ultra-deep water applications in the Gulf of Mexico. Categorical Exclusion is limited to Phase One and Phase Two activities.
CX(s) Applied: A9, B3.6
Date: 07/12/2012
Location(s): Multiple
Offices(s): National Energy Technology Laboratory
Develop, qualify, and test flexible fiber reinforced pipe (FFRP) for ultra-deep water applications in the Gulf of Mexico. Categorical Exclusion is limited to Phase One and Phase Two activities.