Re-work Bryan Mound 30” Crude Oil Pipeline Mainline Valves
CX(s) Applied: B1.3
Date: 04/10/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all labor, tools, materials, equipment and supervision required to rework the Bryan Mound 30” crude oil pipeline mainline valves. Tasks include excavation of the valve stations, installation of vent valves, and rework of the crude oil pipeline mainline valves.