Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank CX(s) Applied: B1.3 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
April 16, 2012Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank
CX(s) Applied: B1.3
Date: 04/16/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all labor, tools, materials, equipment and supervision required to replace the Big Hill RWIS oil water separator tank with a new concrete tank.
CX(s) Applied: B1.3
Date: 04/16/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all labor, tools, materials, equipment and supervision required to replace the Big Hill RWIS oil water separator tank with a new concrete tank.