You are here

CX-008346: Categorical Exclusion Determination

Rework Big Hill 36โ€ Crude Oil Pipeline Mainline Valves
CX(s) Applied: B1.3
Date: 04/19/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall furnish all labor, tools, materials, equipment and supervision required to rework the Big Hill 36โ€ crude oil pipeline mainline valves. Tasks include excavation of the valve stations, installation of vent valves, and rework of the crude oil pipeline mainline valves.