CX-008316: Categorical Exclusion Determination

Slipstream Development and Testing of Siemens POSTCAP Capture and Separation Technology CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

April 18, 2012
Estimated Read Time   min
Slipstream Development and Testing of Siemens POSTCAP Capture and Separation Technology
CX(s) Applied: B3.6
Date: 04/18/2012
Location(s): Florida
Offices(s): National Energy Technology Laboratory

Installation and operation of an advanced post-combustion solvent-based pilot plant at the TECO Big Bend Station that will treat a flue gas slipstream equivalent to approximately 2.5 megawatt electric.