Installation of a ground-source geothermal heat pump system consisting of up to 18 closed-loop geothermal wells, fully buried below grade in the parking area.
CX(s) Applied: A1, B5.19
Date: 05/10/2012
Location(s): Connecticut
Offices(s): National Energy Technology Laboratory
Installation of a ground-source geothermal heat pump system consisting of up to 18 closed-loop geothermal wells, fully buried below grade in the parking area.