Design and Fabrication of 30 Kilowatt Molten Salt Thermal Storage Test Unit CX(s) Applied: B3.6 Date: 04/24/2012 Location(s): Colorado Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
April 24, 2012Design and Fabrication of 30 Kilowatt Molten Salt Thermal Storage Test Unit
CX(s) Applied: B3.6
Date: 04/24/2012
Location(s): Colorado
Offices(s): Golden Field Office
The proposed project would consist of the fabrication and installation of a 30 kilowatt test unit that would circulate molten salt between two storage tanks located in the Thermal Storage Process Laboratory within the Energy System Integration Facility.