Amended: Acquisition of a Portion of Cowlitz County Public Utility District’s 115-Kilovolt Transmission Line Washington Way Substation CX(s) Applied: B1.24 Date: 03/22/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
March 22, 2012Amended: Acquisition of a Portion of Cowlitz County Public Utility District’s 115-Kilovolt Transmission Line Washington Way Substation
CX(s) Applied: B1.24
Date: 03/22/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to acquire a 1.5 mile portion of CCPUD’s existing Longview-Washington Way 115-kilovolt transmission line in order to provide a parallel transmission path for its existing Longview-Cowlitz No. 1 transmission line and to comply with North American Electric Reliability Corporation (NERC)/Western Electricity Coordinating Council (WECC) reliability standards.
CX(s) Applied: B1.24
Date: 03/22/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to acquire a 1.5 mile portion of CCPUD’s existing Longview-Washington Way 115-kilovolt transmission line in order to provide a parallel transmission path for its existing Longview-Cowlitz No. 1 transmission line and to comply with North American Electric Reliability Corporation (NERC)/Western Electricity Coordinating Council (WECC) reliability standards.