Captain Jack-Olinda RAS LLL/LT Replacement Project CX(s) Applied: B1.31 Date: 03/26/2012 Location(s): California Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
March 26, 2012Captain Jack-Olinda RAS LLL/LT Replacement Project
CX(s) Applied: B1.31
Date: 03/26/2012
Location(s): California
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to fund upgrades to BPA equipment at the Transmission Agency of Northern California 500-kilovolt (kV) Olinda Substation (also known as Vic Fazio Substation), which is operated and maintained by Western Area Power Administration (Western).