W4e Hydropower Turbine Generator System Validation CX(s) Applied: B3.6 Date: 02/10/2012 Location(s): Massachusetts, Maine Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
February 10, 2012W4e Hydropower Turbine Generator System Validation
CX(s) Applied: B3.6
Date: 02/10/2012
Location(s): Massachusetts, Maine
Offices(s): Golden Field Office
DOE is proposing to provide federal funding to Walker Wellington, LLC to conduct laboratory research and development activities that advance the W4e hydroturbine. DOE funding would be used to test modifications applied to an existing W4e hydroturbine generator.
CX(s) Applied: B3.6
Date: 02/10/2012
Location(s): Massachusetts, Maine
Offices(s): Golden Field Office
DOE is proposing to provide federal funding to Walker Wellington, LLC to conduct laboratory research and development activities that advance the W4e hydroturbine. DOE funding would be used to test modifications applied to an existing W4e hydroturbine generator.