Routine Site Activities and Seismic Survey at Gnome-Coach Site, New Mexico CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): New Mexico Offices(s): Legacy Management
Office of NEPA Policy and Compliance
February 9, 2012Routine Site Activities and Seismic Survey at Gnome-Coach Site, New Mexico
CX(s) Applied: B1.3, B3.1
Date: 02/09/2012
Location(s): New Mexico
Offices(s): Legacy Management
The U.S. Department of Energy (DOE) is responsible for monitoring contaminant levels in groundwater from three groundwater monitoring wells at the Gnome-Coach, New Mexico Site. Two of the wells contain elevated levels of radionuclides and these samples are managed in accordance with the DOE Investigation-Derived Waste Plan. Activities related to the groundwater monitoring program include installing water access tubes and obtaining water levels each time the wells are sampled.
CX(s) Applied: B1.3, B3.1
Date: 02/09/2012
Location(s): New Mexico
Offices(s): Legacy Management
The U.S. Department of Energy (DOE) is responsible for monitoring contaminant levels in groundwater from three groundwater monitoring wells at the Gnome-Coach, New Mexico Site. Two of the wells contain elevated levels of radionuclides and these samples are managed in accordance with the DOE Investigation-Derived Waste Plan. Activities related to the groundwater monitoring program include installing water access tubes and obtaining water levels each time the wells are sampled.