CX-007790: Categorical Exclusion Determination

Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects CX(s) Applied: B4.3 Date: 10/20/2011 Location(s): CX: none Offices(s): Southwestern Power Administration

Office of NEPA Policy and Compliance

October 20, 2011
Estimated Read Time   min
Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects
CX(s) Applied: B4.3
Date: 10/20/2011
Location(s): CX: none
Offices(s): Southwestern Power Administration

Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects.