Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Idaho Offices(s): Nuclear Energy, Idaho Operations Office
Office of NEPA Policy and Compliance
November 28, 2011Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC
CX(s) Applied: B1.3
Date: 11/28/2011
Location(s): Idaho
Offices(s): Nuclear Energy, Idaho Operations Office
The deterioration of asphalt roads, pads and parking areas at Idaho National Laboratory facilities necessitates the repair and or replacement in selected areas. Repair and/or replacement of sections of asphalt roads, pads, walkways, and parking areas will be conducted at Advanced Mixed Waste Treatment Facility, Idaho Nuclear Technology and Engineering Center, Materials and Fuels Complex, and possibly at other Idaho National Laboratory Facilities.
CX(s) Applied: B1.3
Date: 11/28/2011
Location(s): Idaho
Offices(s): Nuclear Energy, Idaho Operations Office
The deterioration of asphalt roads, pads and parking areas at Idaho National Laboratory facilities necessitates the repair and or replacement in selected areas. Repair and/or replacement of sections of asphalt roads, pads, walkways, and parking areas will be conducted at Advanced Mixed Waste Treatment Facility, Idaho Nuclear Technology and Engineering Center, Materials and Fuels Complex, and possibly at other Idaho National Laboratory Facilities.