Copper Catalyzed peroxide Destruction of Tank 48H Tetraphenylborate Wastes CX(s) Applied: B3.6 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
January 17, 2012Copper Catalyzed peroxide Destruction of Tank 48H Tetraphenylborate Wastes
CX(s) Applied: B3.6
Date: 01/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
At the Savannah River Site (SRS), Tank 48H currently holds approximately 240,000 gallons of slurry which contains potassium and cesium tetraphenylborate (KTPB and CsTPB). Personnel must remove or destroy the organics before the tank space can be utilized or closed. Savannah River Remediation and Savannah River National Laboratory are tasked with studying the decomposition of TPB slurries via the use of catalysts and hydrogen peroxide.
CX(s) Applied: B3.6
Date: 01/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
At the Savannah River Site (SRS), Tank 48H currently holds approximately 240,000 gallons of slurry which contains potassium and cesium tetraphenylborate (KTPB and CsTPB). Personnel must remove or destroy the organics before the tank space can be utilized or closed. Savannah River Remediation and Savannah River National Laboratory are tasked with studying the decomposition of TPB slurries via the use of catalysts and hydrogen peroxide.