Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
January 17, 2012Parking Lot Construction North of Pad 717-14F
CX(s) Applied: B1.15
Date: 01/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Mixed Oxide Services proposes the construction of 52 parking spaces on a 0.225-acre site north of and adjacent to Pad 717-14F. No excavation will be required. The grass on the site will be cut, filter fabrix will be placed on the ground, and crushed stone will be placed on top of the fabric to an approximate depth of two inches. Parking blocks will be used to separate the parking stalls and to serve as stops at the north end of each stall. Parking blocks will be secured using one-foot-long anchor pins. Ground-penetrating radar will be used to survey the area prior to anchor pin installation to avoid pin contact with subterranean infrastructure.
CX(s) Applied: B1.15
Date: 01/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Mixed Oxide Services proposes the construction of 52 parking spaces on a 0.225-acre site north of and adjacent to Pad 717-14F. No excavation will be required. The grass on the site will be cut, filter fabrix will be placed on the ground, and crushed stone will be placed on top of the fabric to an approximate depth of two inches. Parking blocks will be used to separate the parking stalls and to serve as stops at the north end of each stall. Parking blocks will be secured using one-foot-long anchor pins. Ground-penetrating radar will be used to survey the area prior to anchor pin installation to avoid pin contact with subterranean infrastructure.