Record of Categorical Exclusion for Repair Erosion Problems at Big Hill Raw Water Intake Structure CX(s) Applied: B1.3 Date: 12/05/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
December 5, 2011Record of Categorical Exclusion for Repair Erosion Problems at Big Hill Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 12/05/2011
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services required to install erosion protection on the adjacent banks of the Big Hill Raw Water Intake Structure.