CX-007508: Categorical Exclusion Determination

Record of Categorical Exclusion for Rework Bryan Mound Seaway Dock Terminal Bypass Valve MOV-C308 CX(s) Applied: B1.3 Date: 11/16/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

November 16, 2011
Estimated Read Time   min

Record of Categorical Exclusion for Rework Bryan Mound Seaway Dock Terminal Bypass Valve MOV-C308
CX(s) Applied: B1.3
Date: 11/16/2011
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all supervision, transportation, labor, materials, and equipment required to perform valve repairs on the Seaway Dock Terminal bypass valve MOV-C30B. Work shall be performed on the valve inside the Seaway Dock Terminal.