CX-007507: Categorical Exclusion Determination

Record of Categorical Exclusion for Inspection and Repair of West Hackberry-SUN 42-inch Crude Oil Pipeline CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

November 28, 2011
Estimated Read Time   min

Record of Categorical Exclusion for Inspection and Repair of West Hackberry-SUN 42-inch Crude Oil Pipeline
CX(s) Applied: B1.3
Date: 11/28/2011
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all supervision, transportation, labor, materials and equipment required to locate, excavate, and inspect an internal corrosion anomaly at two locations on the West Hackberry to SUN Terminal 42-inch crude oil pipeline. Inspections will be performed by Automated Ultrasonic Testing. Repairs shall be performed based on the inspection results. All work will be performed on the DOE pipeline right-of-way.