Excavation And Installation of a Pad to Anchor Conduit for a 480-Volt Line to Supply Heat to the F-Canyon TruckwellCX(s) Applied: B2.1Date: 09/21/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Sandia Site Office
Office of NEPA Policy and Compliance
September 21, 2011Excavation And Installation of a Pad to Anchor Conduit for a 480-Volt Line to Supply Heat to the F-Canyon Truckwell
CX(s) Applied: B2.1
Date: 09/21/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Sandia Site Office
F-Canyon is installing a new 480-volt line to supply electrical power to a hot water heater used to supply heat to the F-Canyon Truckwell. A pad will be poured near the south end of Building 221-F to support conduit containing the electrical line.
CX(s) Applied: B2.1
Date: 09/21/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Sandia Site Office
F-Canyon is installing a new 480-volt line to supply electrical power to a hot water heater used to supply heat to the F-Canyon Truckwell. A pad will be poured near the south end of Building 221-F to support conduit containing the electrical line.