Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-ACX(s) Applied: B2.1Date: 09/28/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Office of NEPA Policy and Compliance
September 28, 2011Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-A
CX(s) Applied: B2.1
Date: 09/28/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office
Y646 is the current project underway to address Modification 2 of the original Commercial Modification Scope Document (CMSD). CMSD was originated to modify the E-Wing heating, ventilation, and air conditioning system to improve the air flow balance; and to improve radiological confinement and contamination control.
CX(s) Applied: B2.1
Date: 09/28/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office
Y646 is the current project underway to address Modification 2 of the original Commercial Modification Scope Document (CMSD). CMSD was originated to modify the E-Wing heating, ventilation, and air conditioning system to improve the air flow balance; and to improve radiological confinement and contamination control.