CX-006464: Categorical Exclusion Determination

Building 1, 25, and 26 Chiller Design and ReplacementCX(s) Applied: B1.3, B1.4, B1.5Date: 08/08/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory

Office of NEPA Policy and Compliance

August 8, 2011
Estimated Read Time   min
Building 1, 25, and 26 Chiller Design and Replacement
CX(s) Applied: B1.3, B1.4, B1.5
Date: 08/08/2011
Location(s): Morgantown, West Virginia
Office(s): Fossil Energy, National Energy Technology Laboratory

Design and install new chiller system for heating, ventilation and air conditioning system for buildings 1, 25, and 26.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD