Phase and Frequency Locked Magnetrons for Superconducting Radio Frequency Sources, Phase IICX(s) Applied: B3.6Date: 06/24/2011Location(s): Batavia, IllinoisOffice(s): Science, Fermi Site Office
Office of NEPA Policy and Compliance
June 24, 2011CX(s) Applied: B3.6
Date: 06/24/2011
Location(s): Batavia, Illinois
Office(s): Science, Fermi Site Office
Phase II of this project would begin with further magnetic field testing of garnet and ferrite materials using the cold-test fixture that was built for Phase I, with the goal being to determine the best material from which to make the phase-control rod's for the magnetron's anode structure.