You are here

CX-006181: Categorical Exclusion Determination

Construct and Operate a 100 ton per day Ceramic Membrane Oxygen Separation Pilot Scale Unit -Phase III
CX(s) Applied: B3.6, B5.1
Date: 07/11/2011
Location(s): Convent, Louisiana
Office(s): Fossil Energy, National Energy Technology Laboratory

Project is to develop a novel membrane-based oxygen separation technology where prior work, under categorical exclusion, has scaled technology up to 5 tons per day. Current effort is to scale up to 100 tons per day and demonstration as a pilot scale unit.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD