Error message

  • Warning: require_once(): Unable to allocate memory for pool. in redis_autoload() (line 30 of /var/www/energy.gov/htdocs/sites/all/modules/contrib/redis/redis.autoload.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in redis_autoload() (line 30 of /var/www/energy.gov/htdocs/sites/all/modules/contrib/redis/redis.autoload.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in redis_autoload() (line 30 of /var/www/energy.gov/htdocs/sites/all/modules/contrib/redis/redis.autoload.inc).

You are here

CX-006079: Categorical Exclusion Determination

Topic 7A, Emergency Backup Power Systems
CX(s) Applied: A9, B5.1
Date: 06/15/2011
Location(s): Georgia
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

The objective for this Plug Power Project is to deploy and test hybrid hydrogen/liquefied petroleum gas or natural gas Emergency Backup Power Systems. Twenty units would be installed at two different federal facilities.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD