You are here

CX-005897: Categorical Exclusion Determination

Bryan Mound Upgrade Wood to Steel Lighting Poles
CX(s) Applied: B1.3
Date: 05/05/2011
Location(s): Bryan Mound, Texas
Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office

Subcontractor shall furnish all materials, equipment, supplies, tools, labor, supervision, services, and transportation required to upgrade the existing Bryan Mound wood lighting poles to steel lighting poles.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD