North Bonneville-Alcoa Number 1 and 2 Transmission Line CorridorCX(s) Applied: B1.3Date: 03/03/2011Location(s): Clark County, WashingtonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
March 3, 2011CX(s) Applied: B1.3
Date: 03/03/2011
Location(s): Clark County, Washington
Office(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform road reconstruction work to improve vehicle access to structures 16/6, 16/7 and 17/1 of the North Bonneville-Alcoa Number 1 and 2 transmission line corridor from southeast 37th Street to the right-of-way, then to structure 16/6 to the east, and structure 17/1 to the west. The total distance of this project is approximately 2200 feet. Project work may include, but is not limited to: vegetation removal to clear a 20-foot width, grading and shaping of existing roads, repairing road sub-grade, placing and compacting road surfacing, and cross-drain culvert installation. The improved road will have 14-foot wide travel surface. BPA is also proposing a culvert replacement on southeast 37th Street during the in-water work period, July 16 ? September 30.