Facility Heating, Air Conditioning, and Ventilation System Conversion to Ground Source Heat Pump (Phase 2)CX(s) Applied: A9, B5.1, B5.3Date: 01/12/2011Location(s): MontanaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
January 12, 2011CX(s) Applied: A9, B5.1, B5.3
Date: 01/12/2011
Location(s): Montana
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
Flathead Electrical Cooperative (FEC) is proposing the installation and commissioning of four 20 ton geothermal open-looped heat pumps.