CX-004876: Categorical Exclusion Determination

Casa Grande-Empire (Double Circuit Upgrade)CX(s) Applied: B4.13Date: 09/15/2010Location(s): Pinal County, ArizonaOffice(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

September 15, 2010
Estimated Read Time   min
Casa Grande-Empire (Double Circuit Upgrade)
CX(s) Applied: B4.13
Date: 09/15/2010
Location(s): Pinal County, Arizona
Office(s): Bonneville Power Administration

Western proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 115 kilowatt transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures. This will require auger trucks, bulldozers, bucket trucks and cranes. Existing access roads and the existing right-of-way will be used for vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work areas.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD