CX-004750: Categorical Exclusion Determination

West Hackberry Site Building Upgrades, Phase IICX(s) Applied: B1.3Date: 11/23/2010Location(s): LouisianaOffice(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

November 23, 2010
Estimated Read Time   min
West Hackberry Site Building Upgrades, Phase II
CX(s) Applied: B1.3
Date: 11/23/2010
Location(s): Louisiana
Office(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to perform various building upgrades at West Hackberry Buildings 301, 304, and 308. Subcontractor shall evaluate and implement Green Building Design where applicable.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD