Replace Bayou Choctaw Timber Pile Pipe Supports
CX(s) Applied: B1.3
Date: 08/24/2010
Location(s): Bayou Choctaw, Louisiana
Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, equipment, tools, transportation, supervision, labor, mobile lifting equipment, and rigging needed to replace the timber piles and cross beams which support aboveground steel pipelines at Bayou Choctaw.