Bridge and Access Road MaintenanceCX(s) Applied: B1.3Date: 07/12/2010Location(s): Snohomish County, WashingtonOffice(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

July 12, 2010
Estimated Read Time   min

Bridge and Access Road Maintenance
CX(s) Applied: B1.3
Date: 07/12/2010
Location(s): Snohomish County, Washington
Office(s): Bonneville Power Administration


The project consists of replacing an existing wooden bridge deck on a Bonneville Power Administration access road to structures in mile 32 of the Monroe - Custer Number 1 transmission line corridor. Work includes furnishing materials and rebuilding the wood deck with low curb rails and reflectors. Both access road approaches will require re-grading and rocking. No fill or other construction materials are allowed at or below the high water line of the underlying stream. No in-stream activities are to occur in any water body or wetland. Erosion control best management practices are to be utilized to protect surface waters both during and after construction.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD