CX-003138: Categorical Exclusion Determination

Big Hill Buildings 802 and 812 Door Repairs
CX(s) Applied: B1.3
Date: 07/20/2010
Location(s): Big Hill, Texas
Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office

Subcontractor shall provide all materials, equipment, tools, transportation, supervision, labor, mobile lifting equipment, and rigging needed to repair the doors on Big Hill Buildings 802 and 812. Tasks include replacing one damaged coiling steel door, one damaged pedestrian door and damaged building components on Big Hill Building 802; and replacing two corroded pedestrian doors, their frames and hardware, and damaged building trim components on Big Hill Building 812.