You are here

CX-002595: Categorical Exclusion Determination

Competitive Renewable Grants Program - South Carolina Public Service District Grand Strand Solar Station
CX(s) Applied: B1.15, A9, B5.1
Date: 05/12/2010
Location(s): Myrtle Beach, South Carolina
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

Install 58.75 kilowatt ground mounted solar array on brownfield (formerly a waste water treatment plant site) which is previously disturbed - also install 201.16 kilowatt roof mounted solar array on adjacent existing rooftops.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD