Wind Turbine Electric Brake ProjectCX(s) Applied: B3.6Date: 02/22/2010Location(s): OhioOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
February 22, 2010CX(s) Applied: B3.6
Date: 02/22/2010
Location(s): Ohio
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
Parker Hannifin, Aircraft Wheel and Brake Division will use Congressionally Directed Funding through DOE to develop an electric brake system for wind turbine applications. Project activities will include additional testing and design work on the brake system prototype in a laboratory setting. Additional project activities will involve testing the prototype brake system on a currently installed 60 kilowatt turbine. A negotiated arrangement with a local wind turbine manufacturer (Green Energy Technologies) to evaluate the prototype brake on this turbine has been previously established by Parker Hannifin. The field trial will be conducted for approximately 6 months.