You are here

CX-002113: Categorical Exclusion Determination

High-Flux Solar Furnace Building Expansion
CX(s) Applied: B1.15
Date: 04/30/2010
Location(s): Golden, Colorado
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

The proposed project consists of the expansion of the High Flux Solar Building (FHSB) at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) Complex, City of Golden, County of Jefferson, and State of Colorado. The HFSB is located on the mesa top in Site Development Zone 1. The scope of this proposed project would include the construction of a 20-foot by 24-foot single-story expansion on the west side of the FHSB and the completion of the necessary supporting utility infrastructure.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD