You are here

CX-001866: Categorical Exclusion Determination

Renewable Energy Composite Solutions
CX(s) Applied: A1, A9, B5.1
Date: 03/31/2010
Location(s): Vancouver, Washington
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

The retooling effort involves the purchase and installation of equipment to manufacture Vertical Access Wind Turbines (VAWT). VAWT is an advanced wind blade design that promises higher energy conversion than current blade technology. The project will involve: Project and General Administration, Environmental Review, Architectural Design Studies, and New Equipment Purchase and Equipment Retooling to Manufacture and Test the Blades.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD