You are here

CX-001180: Categorical Exclusion Determination

Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project
CX(s) Applied: B1.3
Date: 03/15/2010
Location(s): Snohomish County, Washington
Office(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to replace an existing dilapidated bridge across Little Pilchuck Creek, install three culverts in drainage ditches near the bridge, and repair 2,000 feet of existing on and off right-of-way (ROW) access roads along mile 16 of the Monroe-Custer Number 1 and Number 2 transmission Lines. Project work includes: excavation for bridge removal and installation, grading and shaping of roads, placing and compacting road surfacing, and culvert installation .

DOCUMENT(S) AVAILABLE FOR DOWNLOAD