An Assessment of Projected Life-Cycle Cost for Wave, Tidal, Ocean Current, and In-Stream Hydrokinetic Power in the United States over Time
CX(s) Applied: A9
Date: 02/25/2010
Location(s): California
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

re vision consulting, LLC will use Department of Energy funding to conduct a desktop analysis to understand the present and future costs of hydrokinetic projects. The analysis will look at the potential costs for project development, foundation and structure, supply chain costs, operational procedure costs and electrical collector and grid interconnection costs.