CX-000826: Categorical Exclusion Determination

Install 18 New Office Trailers in the E-Area Rock YardCX(s) Applied: B1.15Date: 10/20/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

Office of NEPA Policy and Compliance

October 20, 2009
Estimated Read Time   min
Install 18 New Office Trailers in the E-Area Rock Yard
CX(s) Applied: B1.15
Date: 10/20/2009
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office

Isolate the following facilities from the Site electrical grid: Buildings 773-62A thru -71A (10 buildings), Buildings 701-20A, 719-1A, -3A, -13A thru -18A, 742-1A, -2A, -3A, 752-79A, -81A and -84A (15 buildings) and, Buildings 752-9A and -85A (2 buildings). Revision 1 adds the following to the scope of this Environmental Evaluation Checklist (EEC): add a sheltered vending machines area, as well as, sidewalks and established erosion control runoff features required for the E-Area Trailer Complex.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD