Facility Upgrades at 222-S Laboratory Complex
CX(s) Applied: B1.3, B1.7, B1.15, B1.31
Date: 08/18/2009
Location(s): Benton County, Washington
Office(s): Environmental Management, Office of River Protection-Richland Office

The United States Department of Energy, Office of River Protection proposes to upgrade the 222-S Laboratory Complex. Facility, system, and instrument upgrades are planned to maintain 222-S laboratory analytical capabilities.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD